Bauhinia paint (Shanghai) 30000 ton/year resin expansion project EIA publicity

Bauhinia paint (Shanghai) 30000 ton/year resin expansion project EIA publicity

December 8, 2011

[China paint information] release unit: Shanghai Academy of Environmental Sciences

release date: December 7, 2011

1 Description

Shanghai Academy of Environmental Sciences is entrusted by Bauhinia paint (Shanghai) Co., Ltd. to carry out the environmental impact assessment of the 30000 ton/year resin expansion project (hereinafter referred to as "the project"). The first information release is now made to the public in accordance with national and municipal laws and regulations

Bauhinia paint (Shanghai) Co., Ltd. and Shanghai Academy of environmental sciences are responsible for the authenticity of the information released at this stage. With the implementation process of the project and the implementation of environmental impact assessment, relevant information will be improved or adjusted

2. Outline of the construction project

(1) project name: 30000 tons/year resin expansion project and the project composed of frequency converters on electrical appliances

(2) project location: Huatong Road, Jinshan second industrial zone, Shanghai

(3) industry of the project: C26 special chemical manufacturing industry

(4) project investment: total investment 53.53 million yuan

(5) project content:

annual output of water-based alkyd resin 12000 tons/year, alkyd resin 15000 tons/year, Polyester resin 2000 tons/year, UV resin 1000 tons/year

3. Contact information of the construction unit

(1) Name: Bauhinia paint (Shanghai) Co., Ltd.

(2) contact address: Huatong Road, Jinshan second industrial zone, Shanghai, 200245

(3) contact person: Mr. Xiong

(4) contact information:

e-mail: xzg@

4 Contact information of the assessment institution

(1) Name: Shanghai Academy of Environmental Sciences

(2) Certificate Number: National Environmental Assessment Certificate Jia Zi No. 1801

(3) address: No. 508 Qinzhou road

(4) contact person: Mr. Ruan

(5) contact information: (fax)

e-mail: ruangx@

5. Working procedures and main work contents of environmental impact assessment

according to the requirements of relevant technical guidelines for environmental impact assessment, Prepare environmental impact statement. The emphasis of environmental impact assessment is determined according to the content and characteristics of the construction project

(1) working procedures

① environmental assessment unit receives environmental assessment tasks

② project data collection and environmental quality status investigation

③ preparation of environmental impact statement

④ public opinion survey

⑤ construction without water Acid and other mixture units shall report the environmental impact statement and other relevant materials to the competent environmental protection department

(2) Main work contents

① engineering now these frustrating data about plastic recycling have inspired Coates to seek better methods for recycling plastics. Field survey and environmental sensitive point investigation

② environmental quality status evaluation

③ project engineering analysis

④ environmental impact prediction and evaluation

⑤ environmental protection measures analysis

6 The main matters for soliciting public opinions

solicit public opinions and suggestions on the environmental protection of the project construction, mainly including:

(1) the main environmental problems existing in the project and the surrounding areas

(2) suggestions on the environmental protection work of the project

(3) attitudes and suggestions on the construction of the project

7. The main ways for the public to put forward opinions

the public can contact the construction unit The evaluation institution sends e-mail, fax, letter and other means to express its opinions on the construction of the project and the environmental assessment work (only accept issues related to environmental protection). Please refer to Article 3 and 4 for contact information. Please leave your real name and basic information (unit or address, education level, occupation, contact information, etc.) as far as possible for public comments, so as to feedback as needed and make a return visit if necessary

8. Effective period of information release

the effective period of this information release and public consultation on the spring applied to vehicles is within 10 working days from the date of this release